Step 3 - Final Energy Engineering
This step is sometimes called the Detailed Energy Study (DES) or final technical
energy audit (TEA). In this step our energy engineers perform final energy
engineering tasks to confirm costs and savings for measures approved in Step 2.
Data logging of energy parameters, subcontractor solicitation for costs and
final energy savings calculations are performed. At the end of this
process, we develop a final report that outlines the exact scope, cost and
savings that will be performed. In addition, a contract is prepared for
implementation of measures included in the project.
Commitment Objective
The client is informed of detailed costs and savings as the project is
developed. The client may make changes to the scope or direction as update
information becomes available in this process.
Financial Obligation
There is no financial obligation added to the obligations already committed in
Step 2.
|